642-813 SWITCH Exam Topics
Implement VLAN based solution, given a network design and a set of requirements
Determine network resources needed for implementing a VLAN based solution on a network
Create a VLAN based implementation plan
Create a VLAN based verification plan
Configure switch-to-switch connectivity for the VLAN based solution
Configure loop prevention for the VLAN based solution
Configure Access Ports for the VLAN based solution
erify the VLAN based solution was implemented properly using show and debug commands
Document results of VLAN implementation and verification
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
Determine network resources needed for implementing a Security solution
Create a implementation plan for the Security solution
Create a verification plan for the Security solution
Configure port security features
Configure general switch security features
Configure private VLANs Configure VACL and PACL
Verify the Security based solution was implemented properly using show and debug commands
Document results of Security implementation and verification
Implement Switch based Layer 3 services, given a network design and a set of requirements
Determine network resources needed for implementing a Switch based Layer 3 solution
Create an implementation plan for the Switch based Layer 3 solution
Create a verification plan for the Switch based Layer 3 solution
Configure routing interfaces Configure Layer 3 Security
Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
Document results of Switch based Layer 3 implementation and verification
Prepare infrastructure to support advanced services
Implement a Wireless Extension of a Layer 2 solution
Implement a VoIP support solution
Implement video support solution
Implement High Availability, given a network design and a set of requirements
Determine network resources needed for implementing High Availability on a network
Create a High Availability implementation plan
Create a High Availability verification plan
Implement first hop redundancy protocols
Implement switch supervisor redundancy
Verify High Availability solution was implemented properly using show and debug commands
Document results of High Availability implementation and verification
Get your 642-813 SWITCH Exam dumps